Below are the scheduled maintenance activities of Maynilad from July 12, 2021 until July 19, 2021. These activities are being done as part of the company’s continuous effort to improve water services in the West Zone.
Affected customers are encouraged to store enough water for the duration of the water service interruption. Maynilad has water tankers on standby, ready to deliver water to affected areas as needed.
Upon resumption of the water service, customers should let the water flow out for a few seconds until the water clears.
We apologize for the inconvenience, and thank you for your support and understanding.
City/Municipality |
Barangay |
From |
To |
Time |
Reason/Activity Details |
Location of Activity |
Caloocan City |
Brgys. 77 to 80 |
July 12, 2021 |
July 12, 2021 |
12 AM to 4 AM |
Network Maintenance Acivity |
Pio Valenzuela corner Samson Road |
Caloocan City |
Brgys. 66, to 68, 71, 72, 75, to 80, 86, 88 and 90 |
July 12, 2021 |
July 12, 2021 |
12 AM to 4 AM |
Network Maintenance Acivity |
11th Avenue corner Rizal |
Caloocan City |
Brgy. 12 |
July 12, 2021 |
July 13, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Langaray (east) corner Dagat Dagatan |
Caloocan City |
Brgys. 4, 6, 7, 8 and 10 to 14 |
July 13, 2021 |
July 14, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Geronimo corner A. Mabini |
Caloocan City |
Brgy. 14 |
July 14, 2021 |
July 14, 2021 |
12 AM to 1:30 AM |
Network Maintenance Acivity |
Tanigue (west) corner Dagat Dagatan |
Caloocan City |
Brgy. 20 |
July 14, 2021 |
July 14, 2021 |
12 AM to 1:30 AM |
Network Maintenance Acivity |
Tamban corner C3 |
Caloocan City |
Northbay Boulevard (South) |
July 14, 2021 |
July 14, 2021 |
12 AM to 1:30 AM |
Network Maintenance Acivity |
Bangus corner C3 |
Caloocan City |
Brgy. 20 |
July 14, 2021 |
July 15, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Tamban corner C3 |
Caloocan City |
Northbay Boulevard (South) |
July 15, 2021 |
July 16, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Honorio Lopez corner C3 |
Caloocan City |
Northbay Boulevard (North) |
July 16, 2021 |
July 17, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Fishport |
Bacoor City |
Molino II to IV and VII, Queens Row Central, Queens Row East, Queens Row West, San Nicolas III |
July 15, 2021 |
July 16, 2021 |
12 NN to 6 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Bacoor City |
Niog III |
July 12, 2021 |
July 13, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Aguinaldo Highway in front of Ceragem, Niog 3, Bacoor City |
Bacoor City |
Panapaan IV |
July 12, 2021 |
July 13, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Aguinaldo Highway corner Sorrento, Panapaan IV, Bacoor City |
Bacoor City |
Dulong Bayan And Mabolo III |
July 12, 2021 |
July 13, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Tirona Highway corner Veraville Arcadia, Dulong Bayan, Bacoor City |
Bacoor City |
Habay II |
July 12, 2021 |
July 13, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Tirona Highway corner Villa Feliza 2, Bacoor City |
Bacoor City |
Niog I and Panapaan IV |
July 13, 2021 |
July 14, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Aguinaldo Highway corner Niog road, Niog I, Bacoor City |
Bacoor City |
Panapaan I and Panapaan V |
July 13, 2021 |
July 14, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Aguinaldo Highway corner Floraville Subdivision, Panapaan I, Bacoor City |
Bacoor City |
Habay I and Habay II |
July 13, 2021 |
July 14, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Aguinaldo Highway (AICS) corner Andrea I, Habay II, Bacoor City |
Bacoor City |
Mabolo I, Mabolo III, Salinas, Salinas I and Real I |
July 14, 2021 |
July 15, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Piñahan road corner Tirona Highway, Mabolo III, Bacoor City |
Bacoor City |
Aniban I |
July 14, 2021 |
July 15, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Narra corner Aguinaldo Highway, Aniban I, Bacoor City |
Bacoor City |
Ligas I and Ligas II |
July 14, 2021 |
July 15, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
De Castro corner Ligas II, Ligas II, Bacoor City |
Bacoor City |
Zapote V, |
July 15, 2021 |
July 16, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
San Francisco corner Coastal road, Longos, Zapote V, Bacoor City |
Bacoor City |
Zapote V |
July 15, 2021 |
July 16, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
San Francisco corner Coastal road, Longos, Zapote, Bacoor City |
Bacoor City |
Talaba IV |
July 15, 2021 |
July 16, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
In front of Jollibee Kalinisan, Talaba IV, Bacoor City |
Bacoor City |
Talaba V and Talaba VI |
July 16, 2021 |
July 17, 2021 |
11 PM to 2 AM |
Network Maintenance Acivity |
Aguinaldo Highway corner Camella Homes Real I, Bacoor City |
Bulacan |
Obando (Catanghalan) |
July 15, 2021 |
July 16, 2021 |
4 PM to 5 AM |
Interconnection of a newly laid 3-ft.-diameter water pipeline to the existing 2.5-ft.-diameter water pipeline |
along Rincon Road corner Marindal Street, Malinta, Valenzuela City |
Imus City |
Pasong Buaya I and II |
July 15, 2021 |
July 16, 2021 |
12 NN to 6 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Imus City |
Bayan Luma V and Bayan Luma VI |
July 12, 2021 |
July 13, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Waling-Waling St., Treelane III, Imus City |
Las Piñas |
Almanza Uno, Almanza Dos, BF International/CAA, Pilar, Talon Uno to Singko |
July 15, 2021 |
July 16, 2021 |
12 NN to 6 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Manila |
Brgy. 659-A, 660-A, 663-A, 664-A, 659 to 664, 666 to 672, 674, 676 to 685, 696 to 701, 821 to 832, 841 to 844, 849 to 853 |
July 13, 2021 |
July 14, 2021 |
10 PM to 9 PM |
Realignment of a 3-ft.-diameter water pipeline |
along Paz St. corner San Gregorio St., Paco, Manila |
Manila |
Brgy. 734 |
July 12, 2021 |
July 13, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
MSDR corner Quirino |
Manila |
Brgys. 746, 756, 758, 759, 760 and 762 |
July 13, 2021 |
July 14, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Estrada corner Dian |
Manila |
Brgys. 847 and 863 |
July 13, 2021 |
July 14, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Flerida corner Laura |
Manila |
Brgys. 841, 842 and 850 |
July 14, 2021 |
July 15, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Zamora corner Canonigo |
Manila |
Brgys. 860 and 862 |
July 14, 2021 |
July 15, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Linceo corner Laura |
Manila |
Brgys. 96, 98, 298, 306, 307, 308, 309 and 314 |
July 15, 2021 |
July 16, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Evangelista corner Recto |
Manila |
Brgys. 860 and 861 |
July 15, 2021 |
July 16, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Laura corner Beata |
Manila |
Brgys. 848 and 861 |
July 16, 2021 |
July 17, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Beata corner PNR (beside creek) |
Manila |
Brgys. 234, 235, 239, 241, 243 and 244 |
July 17, 2021 |
July 18, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Bambang corner Abad Santos (Left) |
Manila |
Brgys. 250, 254, 257, 258 and 265 |
July 18, 2021 |
July 19, 2021 |
11 PM to 2 AM |
Network Maintenance Activity |
Bambang corner Abad Santos (Right) |
Manila |
Brgys. 344 to 350 |
July 13, 2021 |
July 13, 2021 |
12 AM to 12:30 AM |
Network Maintenance Acivity |
Old Antipolo corner Felix Huertas |
Manila |
Brgys. 336 to 341 |
July 13, 2021 |
July 13, 2021 |
1 AM to 1:30 AM |
Network Maintenance Acivity |
Quiricada corner near Felix Huertas (W) |
Manila |
Brgys. 315 to 325 |
July 13, 2021 |
July 13, 2021 |
2 AM to 2:30 AM |
Network Maintenance Acivity |
Quiricada corner near Felix Huertas (E) |
Manila |
Brgys. 315 to 325 |
July 14, 2021 |
July 14, 2021 |
12 AM to 12:30 AM |
Network Maintenance Acivity |
A. Mendoza corner Asturias |
Manila |
Brgys. 373, 374, 375 and 378 |
July 14, 2021 |
July 14, 2021 |
1 AM to 1:30 AM |
Network Maintenance Acivity |
Rizal Avenue corner Tambunting 2 |
Manila |
Brgys. 363, 366, 367, 379, 380, 381 and 382 |
July 14, 2021 |
July 14, 2021 |
2 AM to 2:30 AM |
Network Maintenance Acivity |
Rizal Avenue corner Cavite |
Manila |
Brgys. 349, 364, 365, 367, 368, 369, 370 and 371 |
July 16, 2021 |
July 16, 2021 |
12 AM to 12:30 AM |
Network Maintenance Acivity |
Antipolo corner Leonor Rivera |
Manila |
Brgys. 492, 493, 494, 495, 496, 497 and 500 |
July 16, 2021 |
July 16, 2021 |
1 AM to 1:30 AM |
Network Maintenance Acivity |
Dimasalang corner Antipolo |
Manila |
Brgys. 370, 372 and 375 to 378 |
July 16, 2021 |
July 16, 2021 |
2 AM to 2:30 AM |
Network Maintenance Acivity |
Aurora Boulevard corner Rizal Avenue |
Manila |
Brgys. 664, 671, 672 and 674 |
July 16, 2021 |
July 17, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Romualdez Street corner U.N. Avenue Ermita, Manila |
Muntinlupa |
Alabang (San Jose Village, Sitio Masagana, Sitio Pag-asa, Villa Donata, Pacific Village, Highway Homes), Ayala Alabang (Alabang Town Center, Madrigal Business Park), Ayala Alabang Village, Bayanan, Cupang (Buencamino, Tierra Nueva), Poblacion, Putatan, Tunasan |
July 15, 2021 |
July 16, 2021 |
12 NN to 6 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Parañaque |
BF Homes (Sampaloc Subd., D. Tuazon, Dela Rama, Nicanor Jacinto, J Elizalde, Gil Puyat, Tehran, Tahanan Village, D Cabellion, Goodwill 2, Phase 6 BF, Jackielou Ville, President Ave., Lirag, Ipil Village, Pitong Daan, Vinzon, Massville), Don Bosco, Marcelo Green Village, San Antonio, San Isidro, San Martin De Porres |
July 15, 2021 |
July 16, 2021 |
12 NN to 1 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Parañaque |
BF Homes (Concha Cruz, HEVA, PDP BF Executive, Gardenhomes Abelardo) |
July 15, 2021 |
July 16, 2021 |
12 NN to 6 AM |
Maintenance works at the Putatan Water Treatment Plant and Pumping Station |
Brgy. Putatan, Muntinlupa City |
Parañaque City |
San Dionisio, Sto. Nino and Tambo |
July 12, 2021 |
July 13, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
Mercury Freight (1 Inflow) |
Parañaque City |
Brgys. 76, 86 |
July 13, 2021 |
July 14, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
President’s Avenue |
Parañaque City |
BF Homes, San Antonio |
July 13, 2021 |
July 14, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
President’s Avenue |
Parañaque City |
Don Bosco and San Antonio |
July 14, 2021 |
July 15, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
Saudi corner Somalia |
Parañaque City |
San Isidro |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
Lopez corner Dr. A. Santos |
Parañaque City |
San Antonio |
July 16, 2021 |
July 17, 2021 |
11 PM to 4 AM |
Network Maintenance Acivity |
SAV 1 |
Quezon City |
Batasan Hills |
July 12, 2021 |
July 13, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Jupiter St., San Gabriel St., Pluto St., Earth St., Comet St. and Milkway St. |
Quezon City |
Batasan Hills |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Saturn St., Milkway Comet St., Mars St., Presidential St., Venus St., Diamonds St., Sapphire St. and Ruby St. |
Quezon City |
Greater Fairview |
July 12, 2021 |
July 13, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
East Fairview |
Quezon City |
Bagong Silangan |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Sitio Veterans |
Quezon City |
Sauyo |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Rolling Meadows-2 |
Quezon City |
Bagbag |
July 17, 2021 |
July 18, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Remarville |
Quezon City |
Bagbag |
July 17, 2021 |
July 18, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Rockville-2 |
Quezon City |
Gulod |
July 17, 2021 |
July 18, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Eleuteria corner Belen |
Quezon City |
Gulod |
July 17, 2021 |
July 18, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Senading corner Susana |
Quezon City |
San Bartolome |
July 18, 2021 |
July 19, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Rainbow-2 |
Quezon City |
San Bartolome |
July 18, 2021 |
July 19, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Nomar 1 & 2 |
Quezon City |
Sta Lucia |
July 18, 2021 |
July 19, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Paguio Compound |
Quezon City |
San Bartolome |
July 18, 2021 |
July 19, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
San Pedro-7 corner St. Francis |
Quezon City |
Sauyo |
July 13, 2021 |
July 14, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Baluyot Compound |
Quezon City |
Sta Lucia |
July 13, 2021 |
July 14, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Taraville |
Quezon City |
Greater Fairview |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Lilac corner Dahlia |
Quezon City |
Greater Fairview |
July 15, 2021 |
July 16, 2021 |
11 PM to 4 AM |
Network Maintenance Activity |
Dahlia Parkhomes |
Quezon City |
Sangandaan |
July 14, 2021 |
July 15, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Benefits corner Claims |
Quezon City |
Sta Monica |
July 15, 2021 |
July 16, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Jordan Plaines 3 & 4 |
Quezon City |
Santol |
July 16, 2021 |
July 17, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Landargun Corner Santol |
Quezon City |
Sto. Domingo |
July 17, 2021 |
July 18, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
P. Florentino Corner G. Araneta |
Quezon City |
Talayan |
July 17, 2021 |
July 18, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
G. Araneta corner Del Monte |
Quezon City |
Talayan |
July 17, 2021 |
July 18, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Don Ramon corner Del Monte |
Quezon City |
Sto. Domingo and Talayan |
July 17, 2021 |
July 18, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
G. Araneta corner Quezon Ave. |
Quezon City |
Damayan |
July 13, 2021 |
July 14, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Zamora corner tolentino |
Quezon City |
Sta Monica and Gulod |
July 12, 2021 |
July 13, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Santiago Subd. Along Forest Hills |
Valenzuela |
Arkong Bato, Balangkas, Bisig, Isla, Mabolo, Malinta, Palasan, Pariancillo Villa, Pasolo, Poblacion, Polo, Rincon, Tagalag, |
July 15, 2021 |
July 16, 2021 |
4 PM to 5 AM |
Interconnection of a newly laid 3-ft.-diameter water pipeline to the existing 2.5-ft.-diameter water pipeline |
along Rincon Road corner Marindal Street, Malinta, Valenzuela City |
Valenzuela City |
Karuhatan |
July 12, 2021 |
July 13, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Karuhatan De Gula compound |
Valenzuela City |
Bignay |
July 13, 2021 |
July 14, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Valenzuela View |
Valenzuela City |
Bignay |
July 14, 2021 |
July 15, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Northville 2 corner Galas |
Valenzuela City |
Malanday |
July 16, 2021 |
July 17, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Lorex Street Gen. T. De Leon |
Valenzuela City |
Ugong |
July 16, 2021 |
July 17, 2021 |
10 PM to 4 AM |
Network Maintenance Acivity |
Juan corner Hillside |