Status of Pipe Realignment at Sobriedad, Manila, for DPWH Flood Control Project
10:30 a.m., October 30, 2021 (Saturday) After shutting down its pumping stations and closing several pipe network valves yesterday, Maynilad proceeded to dewater its 7-foot-diameter pipeline along Sobriedad in Sampaloc, Manila, which has to be removed so a path can be cleared for DPWH’s drainage line for its flood control project. The dewatering was aided … Read more